IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0132 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $675 Implemented
MO0132 # 01 Y:1994 01 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,780 $1,580 Implemented
MO0132 # 11 Y:1994 11 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $636 $1,195 Implemented
MO0132 # 10 Y:1994 10 1994 USE SYNTHETIC LUBRICANT $733 $208 Implemented
MO0132 # 09 Y:1994 09 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $938 $2,385 Not Implemented
MO0132 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,412 $490 Implemented
MO0132 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $200 Implemented
MO0132 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $8,337 Implemented
MO0132 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $439 Implemented
MO0132 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $200 Implemented
MO0132 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,612 $2,530 Implemented
WV0043 # 07 Y:1994 07 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,680 $6,985 Not Implemented
WV0043 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,788 $530 Not Implemented
WV0043 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,644 $100 Implemented
WV0043 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $399 $372 Not Implemented
WV0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $787 $500 Implemented
WV0043 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,021 $6,120 Not Implemented
WV0043 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $687 Implemented
NC0029 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $562 $378 Not Implemented
NC0029 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,050 $520 Not Implemented
NC0029 # 03 Y:1994 03 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,345 $40,000 Implemented
NC0029 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,131 $480 Implemented
NC0029 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $11,457 $153,000 Not Implemented