IAC Assessment: MO0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1994
Principal Product conveyor belts
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 198,000
Annual Production 0 Units
Production Hrs. Annual 6,864
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,118 2,296,014 kWh $0.07
Natural Gas $34,711 7,011 MMBtu $4.95
TOTAL ENERGY COSTS $185,829
RECOMMENDED SAVINGS* $19,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,514
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$5,780
Cost:
$1,580
$(-420) (-6,448) - - $6,200 - $(-420)
(-6,448)
kWh
-
-
MMBtu
$6,200
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,750
Cost:
$675
$1,750 26,671 - - - - $1,750
26,671
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,612
Cost:
$2,530
$1,612 24,619 - - - - $1,612
24,619
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,545
Cost:
$200
$1,545 23,447 - - - - $1,545
23,447
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$285
Cost:
$439
$285 4,396 - - - - $285
4,396
kWh
-
-
MMBtu
-
-
Tgal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,114
Cost:
$8,337
$4,114 62,427 - - - - $4,114
62,427
kWh
-
-
MMBtu
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$647
Cost:
$200
$647 9,965 - - - - $647
9,965
kWh
-
-
MMBtu
-
-
Tgal
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,412
Cost:
$490
$1,412 21,395 - - - - $1,412
21,395
kWh
-
-
MMBtu
-
-
Tgal
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$938
Cost:
$2,385
$938 4,103 - - - - $938
4,103
kWh
-
-
MMBtu
-
-
Tgal
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$733
Cost:
$208
$733 11,137 - - - - $733
11,137
kWh
-
-
MMBtu
-
-
Tgal
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$636
Cost:
$1,195
- - $636 128 - - -
-
kWh
$636
128
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$19,452
Cost:
$18,239
$12,616 181,712 $636 128 $6,200 - $12,616
181,712
kWh
$636
128
MMBtu
$6,200
-
Tgal
TOTAL IMPLEMENTED Savings:
$18,514
Cost:
$15,854
$11,678 177,609 $636 128 $6,200 - $11,678
177,609
kWh
$636
128
MMBtu
$6,200
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption