Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3052 | Rubber & Plastics Hose & Belting |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0502 # 10 Y:2005 | 10 | 2005 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,374 | $1,500 | Not Implemented |
WI0502 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,524 | $1,280 | Not Implemented |
WI0502 # 08 Y:2005 | 08 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,579 | $1,238 | Not Implemented |
WI0502 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,670 | $520 | Not Implemented |
WI0502 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | Not Implemented |
WI0502 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $2,699 | $0 | Not Implemented |
WI0502 # 04 Y:2005 | 04 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 03 Y:2005 | 03 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,177 | $9,500 | Not Implemented |
WI0502 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,862 | $27,000 | Not Implemented |
UD0723 # 11 Y:2005 | 11 | 2005 | INSULATE BARE EQUIPMENT | $2,650 | $2,629 | Implemented |
UD0723 # 15 Y:2005 | 15 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $522 | $0 | Implemented |
UD0723 # 14 Y:2005 | 14 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $840 | $0 | Not Implemented |
UD0723 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,423 | $500 | Not Implemented |
UD0723 # 12 Y:2005 | 12 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,164 | $0 | Implemented |
UD0723 # 10 Y:2005 | 10 | 2005 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,730 | $0 | Not Implemented |
UD0723 # 09 Y:2005 | 09 | 2005 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $3,070 | $2,000 | Not Implemented |
UD0723 # 08 Y:2005 | 08 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,309 | $0 | Implemented |
UD0723 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,573 | $0 | Implemented |
UD0723 # 06 Y:2005 | 06 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $0 | Not Implemented |
UD0723 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,126 | $7,000 | Implemented |
UD0723 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,315 | $13,340 | Implemented |
UD0723 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,394 | $0 | Not Implemented |
UD0723 # 02 Y:2005 | 02 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,430 | $0 | Implemented |
UD0723 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,840 | $65,105 | Implemented |