Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
737
matching recommendationsSIC | 3053 | Gaskets, Packing And Sealing Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0667 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,797 | $0 | n/a |
SD0667 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $418,912 | $524,659 | n/a |
SD0667 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $3,727 | n/a |
SD0667 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $260,930 | $10,784 | n/a |
SD0667 # 06 Y:2025 | 06 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $17,049 | $46,406 | n/a |
SD0667 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,190 | $8,318 | n/a |
SD0667 # 04 Y:2025 | 04 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,121 | $299 | n/a |
WM0227 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,869 | $2,450 | n/a |
WM0227 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $727 | $0 | n/a |
WM0227 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $787 | $2,103 | n/a |
WM0227 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,765 | $7,055 | n/a |
AM0930 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $41,855 | $2,780 | n/a |
AM0930 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $2,360 | $90 | n/a |
AM0930 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $865 | $390 | n/a |
AM0930 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,095 | $2,460 | n/a |
AM0930 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,915 | $720 | n/a |
AM0930 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $37,800 | $99,305 | n/a |
AM0930 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $439,088 | $15,000 | n/a |
AM0930 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,120 | $700 | n/a |
TT0299 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,097 | $30 | n/a |
TT0299 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $221 | $90 | n/a |
TT0299 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,478 | $8,003 | n/a |
TT0299 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $632 | $750 | n/a |
TT0299 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,491 | $40 | n/a |
TT0299 # 05 Y:2023 | 05 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $809 | $3,500 | n/a |