IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0103 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $446 $117 Implemented
WI0103 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $857 $0 Implemented
WI0103 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,051 $1,000 Implemented
WI0103 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,145 $4,332 Implemented
WI0103 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,608 $500 Implemented
MA0188 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,449 $1,600 Implemented
MA0188 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $6,213 $2,557 Implemented
MA0188 # 04 Y:1990 04 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,823 $185 Implemented
MA0188 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,378 $245 Implemented
MA0188 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $2,400 Implemented
MA0188 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $215 $545 Implemented
MO0011 # 02 Y:1990 02 1990 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,357 $464 Implemented
MO0011 # 07 Y:1990 07 1990 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,845 $26 Implemented
MO0011 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,890 $1,226 Implemented
MO0011 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,481 $1,000 Implemented
MO0011 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,328 $316 Implemented
MO0011 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $28,450 $7,438 Implemented
RU0089 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,307 $500 Implemented
MA0179 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $70 Implemented
MA0179 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $10,670 $8,250 Implemented
RU0089 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $521 $300 Implemented
RU0089 # 04 Y:1990 04 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,389 $2,520 Implemented
RU0089 # 03 Y:1990 03 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,780 $5,000 Implemented
OK0305 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $236 Implemented
OK0305 # 02 Y:1990 02 1990 INSULATE BARE EQUIPMENT $1,153 $836 Implemented