IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0076 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,762 $6,195 Not Implemented
UA0076 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $354 $335 Not Implemented
UA0076 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $7,334 $13,455 Not Implemented
GT0865 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,450 $84,450 Implemented
GT0865 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $15,290 Implemented
GT0865 # 05 Y:2009 05 2009 USE RADIANT HEATER FOR SPOT HEATING $5,208 $8,000 Not Implemented
GT0865 # 02 Y:2009 02 2009 REDUCE FLUID FLOW RATES $3,226 $1,220 Not Implemented
GT0865 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,003 $1,920 Not Implemented
GT0865 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,697 $1,100 Not Implemented
GT0865 # 01 Y:2009 01 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,450 $0 Not Implemented
GT0865 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $69,163 $135,000 Not Implemented
GT0853 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,634 $55,500 Not Implemented
GT0853 # 01 Y:2008 01 2008 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,045 $0 Implemented
GT0853 # 08 Y:2008 08 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,629 $2,450 Implemented
GT0853 # 09 Y:2008 09 2008 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $148,679 $40,000 Not Implemented
GT0853 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,999 $4,500 Implemented
GT0853 # 07 Y:2008 07 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,989 $8,200 Not Implemented
GT0853 # 05 Y:2008 05 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $73,789 $34,472 Not Implemented
GT0853 # 02 Y:2008 02 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,512 $0 Not Implemented
GT0853 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128,543 $230,470 Implemented
GT0853 # 04 Y:2008 04 2008 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $7,123 $3,000 Implemented
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
GT0718 # 07 Y:2001 07 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,400 $30,000 n/a
GT0718 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $1,625 $7,000 n/a
GT0718 # 05 Y:2001 05 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $35,705 $3,500 n/a