Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2009 |
Principal Product | Rubber Automotive Parts |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 250,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $817,603 | 10,571,135 | kWh | $0.08 |
Natural Gas | $37,793 | 2,180 | MMBtu | $17.34 |
TOTAL ENERGY COSTS | $855,396 | |||
RECOMMENDED SAVINGS* | $154,453 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $46,706 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS |
Savings: $23,450 Cost: - |
$4,250 | 24,870 | $19,200 | - | - | - |
$4,250 24,870 kWh |
$19,200 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5123 REDUCE FLUID FLOW RATES |
Savings: $3,226 Cost: $1,220 |
$3,226 | 37,730 | - | - | - | - |
$3,226 37,730 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $5,697 Cost: $1,100 |
$462 | 5,407 | - | - | $5,235 | 393 |
$462 5,407 kWh |
- - $ |
$5,235 393 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,003 Cost: $1,920 |
$1,003 | 11,730 | - | - | - | - |
$1,003 11,730 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $5,208 Cost: $8,000 |
- | - | - | - | $5,208 | 391 |
- - kWh |
- - $ |
$5,208 391 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $40,450 Cost: $84,450 |
$40,450 | 473,100 | - | - | - | - |
$40,450 473,100 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,256 Cost: $15,290 |
$6,256 | 73,200 | - | - | - | - |
$6,256 73,200 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $69,163 Cost: $135,000 |
$69,163 | 808,920 | - | - | - | - |
$69,163 808,920 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $154,453 Cost: $246,980 |
$124,810 | 1,434,957 | $19,200 | - | $10,443 | 784 | $124,810 1,434,957 kWh |
$19,200 - $ |
$10,443 784 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $46,706 Cost: $99,740 |
$46,706 | 546,300 | - | - | - | - | $46,706 546,300 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |