IAC Assessment: GT0865
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0865
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2009
Principal Product Rubber Automotive Parts
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 250,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $817,603 10,571,135 kWh $0.08
Natural Gas $37,793 2,180 MMBtu $17.34
TOTAL ENERGY COSTS $855,396
RECOMMENDED SAVINGS* $154,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,706
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$23,450
Cost:
-
$4,250 24,870 $19,200 - - - $4,250
24,870
kWh
$19,200
-
$
-
-
MMBtu
02: 2.5123 REDUCE FLUID FLOW RATES Savings:
$3,226
Cost:
$1,220
$3,226 37,730 - - - - $3,226
37,730
kWh
-
-
$
-
-
MMBtu
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$5,697
Cost:
$1,100
$462 5,407 - - $5,235 393 $462
5,407
kWh
-
-
$
$5,235
393
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,003
Cost:
$1,920
$1,003 11,730 - - - - $1,003
11,730
kWh
-
-
$
-
-
MMBtu
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,208
Cost:
$8,000
- - - - $5,208 391 -
-
kWh
-
-
$
$5,208
391
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40,450
Cost:
$84,450
$40,450 473,100 - - - - $40,450
473,100
kWh
-
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,256
Cost:
$15,290
$6,256 73,200 - - - - $6,256
73,200
kWh
-
-
$
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$69,163
Cost:
$135,000
$69,163 808,920 - - - - $69,163
808,920
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$154,453
Cost:
$246,980
$124,810 1,434,957 $19,200 - $10,443 784 $124,810
1,434,957
kWh
$19,200
-
$
$10,443
784
MMBtu
TOTAL IMPLEMENTED Savings:
$46,706
Cost:
$99,740
$46,706 546,300 - - - - $46,706
546,300
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas