IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,044

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0848 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $285,734 $2,502,664 Not Implemented
UL2211 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $15,000 Not Implemented
UL2211 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,806 $20,000 Not Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $96,458 $783,531 Not Implemented
UL2211 # 06 Y:2022 06 2022 USE SOLAR HEAT TO HEAT WATER $60,938 $150,000 Not Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
AM0853 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,850 $5,000 Implemented
AM0853 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,040 $19,415 Not Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 04 Y:2022 04 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,455 $4,175 Not Implemented
AM0853 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,715 $500 Implemented
AM0853 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $2,537 $2,030 Not Implemented
AM0853 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $2,070 $275 Implemented
AM0853 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,170 $345 Implemented
AM0853 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $830 $500 Implemented
AM0853 # 10 Y:2022 10 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Implemented
WV0615 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $8,661 $16,998 Not Implemented
WV0615 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $233 Implemented
WV0615 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $4,561 $13,105 Not Implemented
WV0615 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $3,209 $13,902 Not Implemented
WV0615 # 05 Y:2021 05 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,781 $2,300 Implemented
WV0615 # 06 Y:2021 06 2021 DEVELOP A REPAIR/REPLACE POLICY $2,598 $5,175 Implemented
WV0615 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $944 $70 Implemented