IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,100

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0653 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,758 $2,675 Implemented
WV0653 # 12 Y:2023 12 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,538 $21,440 Not Implemented
WV0653 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,757 $1,288 Implemented
WV0653 # 14 Y:2023 14 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,320 $1,500 Implemented
WV0653 # 15 Y:2023 15 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,200 $3,036 Implemented
WV0653 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $1,621 $787 Implemented
WV0653 # 17 Y:2023 17 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,453 $7,240 Not Implemented
SJ0006 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,467 $665,395 Not Implemented
SJ0006 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,014 $7,324 Not Implemented
SJ0006 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $798 $2,977 Not Implemented
SJ0006 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,078 $7,298 Not Implemented
SJ0006 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,647 $23,000 Not Implemented
SJ0006 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,713 $4,600 Not Implemented
SJ0006 # 07 Y:2023 07 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,791 $39,456 Not Implemented
SJ0006 # 08 Y:2023 08 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $332 $1,762 Not Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $13,706 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 08 Y:2023 08 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $51,744 $18,218 Implemented
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
TR0041 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $3,857 Implemented