Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0494 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $689 | $30 | Implemented |
OK0494 # 04 Y:1996 | 04 | 1996 | REPAIR AND ELIMINATE STEAM LEAKS | $5,851 | $3,600 | Implemented |
OK0494 # 03 Y:1996 | 03 | 1996 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $12,077 | $3,040 | Implemented |
OK0494 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,329 | $98,000 | Not Implemented |
OK0494 # 01 Y:1996 | 01 | 1996 | PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS | $91,927 | $31,996 | Not Implemented |
OK0494 # 06 Y:1996 | 06 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $469 | $1,000 | Implemented |
KU0428 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75 | $600 | Not Implemented |
KU0428 # 10 Y:1994 | 10 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $120 | $163 | Implemented |
KU0428 # 09 Y:1994 | 09 | 1994 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $346 | $105 | Implemented |
KU0428 # 08 Y:1994 | 08 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $304 | $549 | Implemented |
KU0428 # 07 Y:1994 | 07 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $135 | $70 | Not Implemented |
KU0428 # 06 Y:1994 | 06 | 1994 | USE SYNTHETIC LUBRICANT | $256 | $136 | Not Implemented |
KU0428 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,408 | $26,000 | Not Implemented |
KU0428 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $256 | $450 | Not Implemented |
KU0428 # 02 Y:1994 | 02 | 1994 | INSTALL OCCUPANCY SENSORS | $211 | $250 | Not Implemented |
KU0428 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,624 | $3,145 | Not Implemented |
KU0389 # 01 Y:1992 | 01 | 1992 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $12,201 | $0 | Implemented |
KU0389 # 10 Y:1992 | 10 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $120 | Not Implemented |
KU0389 # 09 Y:1992 | 09 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $886 | $1,050 | Not Implemented |
KU0389 # 08 Y:1992 | 08 | 1992 | INSULATE BARE EQUIPMENT | $984 | $1,336 | Not Implemented |
KU0389 # 07 Y:1992 | 07 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $962 | $0 | Not Implemented |
KU0389 # 06 Y:1992 | 06 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,077 | $4,000 | Not Implemented |
KU0389 # 05 Y:1992 | 05 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,491 | $4,158 | Not Implemented |
KU0389 # 04 Y:1992 | 04 | 1992 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,964 | $2,250 | Implemented |
KU0389 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $1,546 | $1,000 | Implemented |