IAC logo
IAC Assessment: OK0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Mylar and Latex balloons
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 200,000
Annual Production 28,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,946 4,143,904 kWh $0.04
Electricity Demand $107,571 9,468 kW-months/year $11.36
Electricity Fees $8,762 - $ -
Natural Gas $29,990 8,163 MMBtu $3.67
TOTAL ENERGY COSTS $406,410
RECOMMENDED SAVINGS* $135,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,086
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$91,927
Cost:
$31,996
- - - - - - $91,927 322,920 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$91,927
322,920
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$24,329
Cost:
$98,000
$19,708 368,113 $9,232 708 $(-4,611) (-1,478) - - $19,708
368,113
kWh
$9,232
708
kW-months/year
$(-4,611)
(-1,478)
MMBtu
-
-
lb
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$12,077
Cost:
$3,040
$12,077 182,884 - - - - - - $12,077
182,884
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,851
Cost:
$3,600
$5,851 142,732 - - - - - - $5,851
142,732
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$689
Cost:
$30
$689 11,137 - - - - - - $689
11,137
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$469
Cost:
$1,000
- - $469 36 - - - - -
-
kWh
$469
36
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$135,342
Cost:
$137,666
$38,325 704,866 $9,701 744 $(-4,611) (-1,478) $91,927 322,920 $38,325
704,866
kWh
$9,701
744
kW-months/year
$(-4,611)
(-1,478)
MMBtu
$91,927
322,920
lb
TOTAL IMPLEMENTED Savings:
$19,086
Cost:
$7,670
$18,617 336,753 $469 36 - - - - $18,617
336,753
kWh
$469
36
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)