Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0967 # 10 Y:2017 | 10 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,958 | $0 | Not Implemented |
UD0967 # 19 Y:2017 | 19 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,773 | $3,825 | Not Implemented |
UD0967 # 18 Y:2017 | 18 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $15,207 | $65,253 | Not Implemented |
UD0967 # 17 Y:2017 | 17 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,764 | $0 | Implemented |
UD0967 # 16 Y:2017 | 16 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121,762 | $503,900 | Not Implemented |
UD0967 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,735 | $14,110 | Not Implemented |
UD0967 # 14 Y:2017 | 14 | 2017 | MINIMIZE WATER USAGE | $13,765 | $6,000 | Implemented |
UD0967 # 13 Y:2017 | 13 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,271 | $4,000 | Not Implemented |
UD0967 # 12 Y:2017 | 12 | 2017 | INSULATE BARE EQUIPMENT | $6,116 | $2,824 | Not Implemented |
UD0967 # 11 Y:2017 | 11 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,362 | $0 | Not Implemented |
UD0967 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,073 | $18,000 | Not Implemented |
UD0967 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,781 | $48,000 | Not Implemented |
UD0967 # 08 Y:2017 | 08 | 2017 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $32,400 | $4,662 | Implemented |
UD0967 # 07 Y:2017 | 07 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $89,503 | $0 | Implemented |
UD0967 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,466 | $5,000 | Not Implemented |
UD0967 # 05 Y:2017 | 05 | 2017 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,793 | $4,925 | Not Implemented |
UD0967 # 04 Y:2017 | 04 | 2017 | INSULATE FEEDWATER TANK | $1,855 | $4,743 | Not Implemented |
UD0967 # 03 Y:2017 | 03 | 2017 | REPAIR OR REPLACE STEAM TRAPS | $3,938 | $7,676 | Implemented |
UD0967 # 02 Y:2017 | 02 | 2017 | OPERATE BOILERS ON HIGH FIRE SETTING | $5,894 | $27 | Implemented |