IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0599 # 12 Y:2025 12 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,690 $12,500 n/a
LE0599 # 11 Y:2025 11 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,291 $137,607 n/a
LE0599 # 10 Y:2025 10 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $39,348 $166,600 n/a
LE0599 # 09 Y:2025 09 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,397 $22,164 n/a
LE0599 # 08 Y:2025 08 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $808 $1,500 n/a
LE0599 # 07 Y:2025 07 2025 BURN A LESS EXPENSIVE GRADE OF FUEL $2,581 $4,000 n/a
LE0599 # 06 Y:2025 06 2025 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $98,974 $65,000 n/a
LE0599 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,274 $2,000 n/a
LE0599 # 04 Y:2025 04 2025 UPGRADE OBSOLETE EQUIPMENT $66,584 $25,000 n/a
LE0599 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,855 $7,000 n/a
LE0599 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,295 $100 n/a
LE0599 # 01 Y:2025 01 2025 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,231 $50 n/a
LE0350 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $5,254 $9,913 Not Implemented
LE0350 # 13 Y:2012 13 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,986 $3,000 Not Implemented
LE0350 # 12 Y:2012 12 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,008 $2,000 Implemented
LE0350 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $5,076 $1,275 Implemented
LE0350 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $21 $0 Implemented
LE0350 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $634 $0 Implemented
LE0350 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,053 $600 Not Implemented
LE0350 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,490 $1,000 Implemented
LE0350 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,117 $2,783 Not Implemented
LE0350 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,329 $8,800 Not Implemented
LE0350 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,994 $15,500 Not Implemented
LE0350 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,486 $11,638 Not Implemented
LE0350 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,189 $3,025 Not Implemented