IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0321 # 06 Y:1987 06 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,004 $0 Implemented
WI0009 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,844 $5,000 Not Implemented
WI0009 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,854 $1,120 Implemented
WI0009 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $5,373 Implemented
WI0009 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $284 $0 Implemented
WI0009 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $15,779 $0 Not Implemented
TN0321 # 12 Y:1987 12 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $466 $0 Implemented
TN0321 # 11 Y:1987 11 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $715 $475 Implemented
TN0321 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $470 Implemented
TN0321 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $885 $615 Implemented
TN0321 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,072 $800 Implemented
TN0321 # 07 Y:1987 07 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,522 $5,544 Not Implemented
TN0321 # 05 Y:1987 05 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $769 $0 Implemented
TN0321 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $795 $300 Implemented
TN0321 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $432 Implemented
TN0321 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,710 $180 Implemented
TN0321 # 01 Y:1987 01 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,567 $3,500 Implemented
AT0088 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $2,632 $0 Not Implemented
AT0088 # 06 Y:1987 06 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $316 $500 Implemented
AT0088 # 05 Y:1987 05 1987 AIR CONDITION ONLY SPACE NECESSARY $1,720 $5,000 Implemented
AT0088 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $854 $800 Implemented
AT0088 # 03 Y:1987 03 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $802 $1,500 Implemented
AT0088 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $366 $307 Implemented