IAC logo
IAC Assessment: TN0321
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0321
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1987
Principal Product INDUS. AUTOMOTIVE PARTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 96
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,827 2,293,083 kWh $0.05
Natural Gas $24,513 4,597 MMBtu $5.33
TOTAL ENERGY COSTS $145,340
RECOMMENDED SAVINGS* $26,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,126
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$9,567
Cost:
$3,500
- - $9,567 1,805 -
-
kWh
$9,567
1,805
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,710
Cost:
$180
$6,710 126,612 - - $6,710
126,612
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,320
Cost:
$432
$1,320 24,912 - - $1,320
24,912
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$795
Cost:
$300
- - $795 150 -
-
kWh
$795
150
MMBtu
05: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$769
Cost:
-
- - $769 145 -
-
kWh
$769
145
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,004
Cost:
-
$2,004 37,808 - - $2,004
37,808
kWh
-
-
MMBtu
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,522
Cost:
$5,544
$1,522 28,722 - - $1,522
28,722
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,072
Cost:
$800
$1,072 20,223 - - $1,072
20,223
kWh
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$885
Cost:
$615
$885 16,706 - - $885
16,706
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$823
Cost:
$470
$823 15,533 - - $823
15,533
kWh
-
-
MMBtu
11: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$715
Cost:
$475
$715 13,482 - - $715
13,482
kWh
-
-
MMBtu
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$466
Cost:
-
$466 8,792 - - $466
8,792
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,648
Cost:
$12,316
$15,517 292,790 $11,131 2,100 $15,517
292,790
kWh
$11,131
2,100
MMBtu
TOTAL IMPLEMENTED Savings:
$25,126
Cost:
$6,772
$13,995 264,068 $11,131 2,100 $13,995
264,068
kWh
$11,131
2,100
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas