Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2437 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,975 | $88,610 | n/a |
KS2437 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,984 | $340,586 | n/a |
KS2437 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,870 | $69,278 | n/a |
KS2437 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,668 | $1,600 | n/a |
KS2437 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $771 | $2,184 | n/a |
KS2437 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,218 | $60 | n/a |
KS2437 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,199 | $5,960 | n/a |
KS2437 # 08 Y:2024 | 08 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,546 | $4,072 | n/a |
KS2437 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $65,208 | $627,000 | n/a |
WV0667 # 02 Y:2024 | 02 | 2024 | INSTALL TURBULATORS | $6,784 | $4,404 | n/a |
WV0667 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,599 | $13,481 | n/a |
WV0667 # 14 Y:2024 | 14 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $328 | $1,530 | n/a |
WV0667 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,396 | $18,935 | n/a |
WV0667 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,417 | $2,917 | n/a |
WV0667 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,850 | $10,551 | n/a |
WV0667 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $874 | $1,127 | n/a |
WV0667 # 11 Y:2024 | 11 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,520 | $7,198 | n/a |
WV0667 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $2,181 | $2,720 | n/a |
WV0667 # 10 Y:2024 | 10 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,648 | $8,028 | n/a |
WV0667 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,123 | $7,270 | n/a |
WV0667 # 08 Y:2024 | 08 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,409 | $5,810 | n/a |
WV0667 # 05 Y:2024 | 05 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,235 | $20,025 | n/a |
WV0667 # 13 Y:2024 | 13 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $678 | $1,484 | n/a |
MI0446 # 03 Y:2024 | 03 | 2024 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $15,109 | $12,480 | n/a |
MI0446 # 01 Y:2024 | 01 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $103,738 | $390,000 | n/a |