IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0038 # 02 Y:2024 02 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $48,942 $14,000 n/a
CC0038 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,339 $20,000 n/a
CC0038 # 04 Y:2024 04 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $34,175 $0 n/a
CC0038 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $143,864 $738,776 n/a
CC0038 # 06 Y:2024 06 2024 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,129 $6,200 n/a
CC0038 # 07 Y:2024 07 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,304 $24,675 n/a
CC0038 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,471 $1,560 n/a
CC0038 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,643 $40,000 n/a
NC0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $1,592 $2,600 Implemented
NC0399 # 09 Y:2010 09 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,805 $6,000 Implemented
NC0399 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $4,744 $1,550 Implemented
NC0399 # 07 Y:2010 07 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,943 $8,852 Not Implemented
NC0399 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $7,151 $23,576 Implemented
NC0399 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $0 Implemented
NC0399 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $1,429 $5,438 Implemented
NC0399 # 03 Y:2010 03 2010 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $40,261 $0 Not Implemented
NC0399 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $200 Implemented
NC0399 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,597 $100 Implemented