IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0162 # 01 Y:2021 01 2021 REPLACE BOILER $14,495 $38,512 Not Implemented
WM0162 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,315 $3,500 Not Implemented
WM0162 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,757 $2,560 Not Implemented
WM0162 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $8,039 Not Implemented
WM0162 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,584 $2,625 Not Implemented
WM0162 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,380 $2,300 Not Implemented
WM0162 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,298 $4,575 Not Implemented
WI0438 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,005 $15,000 Implemented
WI0438 # 02 Y:2003 02 2003 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $4,455 $5,000 Implemented
WI0438 # 03 Y:2003 03 2003 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION $2,640 $8,000 Not Implemented
WI0438 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,901 $1,000 Implemented
WI0438 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,793 $2,800 Implemented
WI0438 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $120 Implemented
WI0438 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $640 Not Implemented