Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2003 |
Principal Product | Injection Molding/ Urethane Load Wheels |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3061 - Mechanical Rubber Goods |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 86,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,000 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $222,735 | 7,033,000 | kWh | $0.03 |
Electricity Demand | $127,645 | 16,836 | kW-months/year | $7.58 |
Electricity Fees | $23,207 | - | $ | - |
Natural Gas | $37,754 | 6,969 | MMBtu | $5.42 |
TOTAL ENERGY COSTS | $422,066 | |||
RECOMMENDED SAVINGS* | $20,408 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,507 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $9,005 Cost: $15,000 |
- | - | $9,005 | 1,086 | - | - | - | - |
- - kWh |
$9,005 1,086 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM |
Savings: $4,455 Cost: $5,000 |
- | - | - | - | - | - | $4,455 | 1,485 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,455 1,485 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7393 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION |
Savings: $2,640 Cost: $8,000 |
- | - | - | - | - | - | $2,640 | 1,452 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,640 1,452 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,901 Cost: $1,000 |
- | - | - | - | $1,901 | 351 | - | - |
- - kWh |
- - kW-months/year |
$1,901 351 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,793 Cost: $2,800 |
- | - | - | - | $1,793 | 331 | - | - |
- - kWh |
- - kW-months/year |
$1,793 331 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $353 Cost: $120 |
$257 | 8,004 | $96 | 12 | - | - | - | - |
$257 8,004 kWh |
$96 12 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $261 Cost: $640 |
$184 | 5,515 | $77 | 10 | - | - | - | - |
$184 5,515 kWh |
$77 10 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,408 Cost: $32,560 |
$441 | 13,519 | $9,178 | 1,108 | $3,694 | 682 | $7,095 | 2,937 | $441 13,519 kWh |
$9,178 1,108 kW-months/year |
$3,694 682 MMBtu |
$7,095 2,937 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,507 Cost: $23,920 |
$257 | 8,004 | $9,101 | 1,098 | $3,694 | 682 | $4,455 | 1,485 | $257 8,004 kWh |
$9,101 1,098 kW-months/year |
$3,694 682 MMBtu |
$4,455 1,485 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) |