IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0002 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $34,109 $0 Not Implemented
ND0002 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,044 $2,898 Not Implemented
ND0002 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,738 $6,000 Not Implemented
ND0002 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $104 $70 Not Implemented
ND0002 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,617 $397 Not Implemented
ND0002 # 06 Y:1991 06 1991 DISCONNECT BALLASTS $65 $115 Not Implemented
ND0002 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $6,111 Not Implemented
TS0032 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,844 $1,500 Not Implemented
TS0032 # 02 Y:1986 02 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,661 $4,000 Not Implemented
TS0032 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $178 Not Implemented
TS0032 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,690 $0 Not Implemented
TS0024 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $25 Not Implemented
TS0024 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $214 Not Implemented
TS0024 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $168 $105 Not Implemented
TS0024 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,617 $4,028 Not Implemented
TS0024 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,293 $3,000 Not Implemented
TS0024 # 06 Y:1985 06 1985 INSTALL STORM WINDOWS AND DOORS $281 $140 Not Implemented
TS0004 # 01 Y:1984 01 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,158 $1,360 Not Implemented
TS0004 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,748 $0 Not Implemented
TS0004 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $396 $33 Not Implemented
TS0004 # 04 Y:1984 04 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,174 $42,000 Not Implemented
TS0004 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $11,480 $5,460 Not Implemented
TS0004 # 06 Y:1984 06 1984 INSTALL SET-BACK TIMERS $5,296 $0 Not Implemented
TS0004 # 07 Y:1984 07 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $10,352 $25,218 Not Implemented