IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0917 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $577 Implemented
OK0917 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $537 $55 Implemented
OK0917 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,019 $6,287 Not Implemented
OK0917 # 06 Y:2015 06 2015 USE OPTIMUM TEMPERATURE $8,870 $180 Implemented
OK0917 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,875 $2,000 Implemented
OK0917 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,154 $72 Implemented
OK0863 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,703 $2,500 Not Implemented
OK0863 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $10,721 $1,250 Not Implemented
OK0863 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,069 $22,428 Not Implemented
OK0863 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,208 $4,450 Not Implemented
OK0756 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $12,665 $8,800 Not Implemented
OK0756 # 01 Y:2008 01 2008 $2,140 $200 Not Implemented
OK0756 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $31,429 $11,000 Not Implemented
OK0756 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,491 $1,000 Implemented
OK0756 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,469 $7,702 Not Implemented
OK0756 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $36,391 $6,600 Not Implemented
AR0124 # 10 Y:1997 10 1997 $26,000 $2,500 Not Implemented
AR0124 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $120 Implemented
AR0124 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,334 $586 Not Implemented
AR0124 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,514 $0 Not Implemented
AR0124 # 08 Y:1997 08 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $950 $100 Implemented
AR0124 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,103 $1,238 Implemented
AR0124 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $100 Implemented
AR0124 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $0 Implemented
AR0124 # 04 Y:1997 04 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,617 $100 Implemented