IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0097 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,485 $120 Implemented
AR0097 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,496 $11,870 Implemented
AR0097 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,972 $1,745 Not Implemented
AR0097 # 04 Y:1996 04 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,240 $20,000 Not Implemented
AR0097 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $929 $0 Implemented
AR0097 # 06 Y:1996 06 1996 OPTIMIZE PLANT POWER FACTOR $5,388 $1,000 Implemented
AR0097 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,027 $4,900 Implemented
AR0097 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $1,489 $1,000 Implemented
MO0179 # 09 Y:1996 09 1996 RECOVER WASTE HEAT FROM EQUIPMENT $16,497 $41,242 Not Implemented
MO0179 # 08 Y:1996 08 1996 USE SYNTHETIC LUBRICANT $1,650 $140 Not Implemented
MO0179 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,341 $263 Implemented
MO0179 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,587 $50 Implemented
MO0179 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,057 $0 Implemented
MO0179 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,967 $9,063 Implemented
MO0179 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95 $0 Not Implemented
MO0179 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,159 $5,364 Not Implemented
MO0179 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,921 $1,311 Implemented
MO0179 # 10 Y:1996 10 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $7,000 $20,000 Implemented
WI0265 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $1,750 $6,000 Not Implemented
WI0265 # 11 Y:1996 11 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $500 $2,000 Not Implemented
WI0265 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,667 $8,000 Not Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
WI0265 # 04 Y:1996 04 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,626 $27,600 Not Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 02 Y:1996 02 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,889 $0 Not Implemented