IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Rubber cushion
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 11,000,000 Units
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,322 3,797,773 kWh $0.05
Electricity Demand $24,712 11,426 kW-months/year $2.16
Natural Gas $188,317 50,338 MMBtu $3.74
TOTAL ENERGY COSTS $413,351
RECOMMENDED SAVINGS* $43,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,873
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,921
Cost:
$1,311
$1,763 32,825 $158 79 - - - - $1,763
32,825
kWh
$158
79
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,159
Cost:
$5,364
$1,968 36,635 $191 96 - - - - $1,968
36,635
kWh
$191
96
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$95
Cost:
-
$90 1,758 $5 2 - - - - $90
1,758
kWh
$5
2
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,967
Cost:
$9,063
$5,561 103,165 $406 204 - - - - $5,561
103,165
kWh
$406
204
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,057
Cost:
-
$988 18,464 $69 35 - - - - $988
18,464
kWh
$69
35
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,587
Cost:
$50
$3,355 62,427 $232 116 - - - - $3,355
62,427
kWh
$232
116
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,341
Cost:
$263
$3,124 58,030 $217 109 - - - - $3,124
58,030
kWh
$217
109
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,650
Cost:
$140
$1,542 28,722 $108 54 - - - - $1,542
28,722
kWh
$108
54
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,497
Cost:
$41,242
- - - - $16,497 4,411 - - -
-
kWh
-
-
kW-months/year
$16,497
4,411
MMBtu
-
-
lb
10: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$7,000
Cost:
$20,000
- - - - - - $7,000 20,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,000
20,000
lb
TOTAL RECOMMENDED Savings:
$43,274
Cost:
$77,433
$18,391 342,026 $1,386 695 $16,497 4,411 $7,000 20,000 $18,391
342,026
kWh
$1,386
695
kW-months/year
$16,497
4,411
MMBtu
$7,000
20,000
lb
TOTAL IMPLEMENTED Savings:
$22,873
Cost:
$30,687
$14,791 274,911 $1,082 543 - - $7,000 20,000 $14,791
274,911
kWh
$1,082
543
kW-months/year
-
-
MMBtu
$7,000
20,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)