IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0128 # 03 Y:1988 03 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,562 $0 Implemented
MA0128 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $69 Implemented
MA0128 # 05 Y:1988 05 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $570 $250 Implemented
MA0128 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,384 $6,500 Implemented
MA0112 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $14,021 $8,866 Not Implemented
MA0112 # 02 Y:1988 02 1988 INSTALL SET-BACK TIMERS $534 $0 Implemented
MA0112 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $243 Not Implemented
MA0112 # 04 Y:1988 04 1988 REDESIGN PROCESS $5,082 $0 Not Implemented
MA0105 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $150 Implemented
MA0105 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $813 $197 Not Implemented
MA0105 # 03 Y:1987 03 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,507 $4,630 Implemented
MA0105 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $851 $0 Implemented
MA0105 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $3,875 $1,100 Implemented
MA0105 # 06 Y:1987 06 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,153 $860 Not Implemented
MA0105 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,580 $6,238 Implemented
MA0105 # 08 Y:1987 08 1987 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,603 $1,000 Not Implemented
MA0096 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $1,581 $551 Implemented
MA0096 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $78 Implemented
MA0096 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,922 $746 Implemented
MA0096 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $715 $450 Not Implemented
MA0096 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,966 $1,014 Not Implemented
MA0096 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,391 $893 Not Implemented
MA0096 # 07 Y:1987 07 1987 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $22,563 $4,750 Implemented
MA0096 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,030 $3,900 Not Implemented
MA0066 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,416 $200 Not Implemented