IAC Assessment: MA0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1987
Principal Product MOLDED PLASTIC CMPONENTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,599 2,737,104 kWh $0.08
Fuel Oil #2 $8,061 2,090 MMBtu $3.86
TOTAL ENERGY COSTS $216,660
RECOMMENDED SAVINGS* $74,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,468
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,581
Cost:
$551
$1,743 22,860 $(-162) (-42) $1,743
22,860
kWh
$(-162)
(-42)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$402
Cost:
$78
$402 5,275 - - $402
5,275
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,922
Cost:
$746
- - $1,922 498 -
-
kWh
$1,922
498
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$715
Cost:
$450
$715 9,379 - - $715
9,379
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,966
Cost:
$1,014
$2,167 28,429 $(-201) (-52) $2,167
28,429
kWh
$(-201)
(-52)
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,391
Cost:
$893
$(-849) (-11,137) $3,240 840 $(-849)
(-11,137)
kWh
$3,240
840
MMBtu
07: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$22,563
Cost:
$4,750
$22,563 296,014 - - $22,563
296,014
kWh
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$43,030
Cost:
$3,900
$43,030 566,237 - - $43,030
566,237
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$74,570
Cost:
$12,382
$69,771 917,057 $4,799 1,244 $69,771
917,057
kWh
$4,799
1,244
MMBtu
TOTAL IMPLEMENTED Savings:
$26,468
Cost:
$6,125
$24,708 324,149 $1,760 456 $24,708
324,149
kWh
$1,760
456
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2