IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

357

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0350 # 06 Y:1988 06 1988 IMPROVE LUBRICATION PRACTICES $136 $60 Implemented
TN0327 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $10,649 $470 Not Implemented
TN0327 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,961 $2,175 Implemented
TN0327 # 03 Y:1988 03 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,823 $900 Implemented
TN0327 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $4,249 $1,290 Not Implemented
TN0327 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,029 $0 Implemented
TN0327 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,448 $1,200 Implemented
TN0314 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,593 $4,040 Implemented
TN0314 # 02 Y:1987 02 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,581 $16,250 Implemented
TN0314 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $7,234 $920 Not Implemented
TN0314 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $6,113 $0 Not Implemented
TN0314 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,182 $0 Not Implemented
TN0314 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $1,839 $1,160 Implemented
TN0314 # 07 Y:1987 07 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,779 $250 Implemented
TN0304 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $10,943 $650 Implemented
TN0304 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $2,510 $2,700 Not Implemented
TN0304 # 03 Y:1987 03 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,630 $12,000 Not Implemented
TN0304 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $4,039 $0 Implemented
TN0304 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,637 $2,680 Implemented
TN0304 # 06 Y:1987 06 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,707 $0 Not Implemented
TN0304 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $0 Not Implemented
TN0304 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $549 $94 Not Implemented
TN0283 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,143 $20,000 Implemented
TN0283 # 02 Y:1986 02 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,904 $0 Not Implemented
TN0283 # 04 Y:1986 04 1986 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,182 $940 Implemented