IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,279

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0381 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $0 Implemented
SF0323 # 01 Y:2006 01 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,385 $4,000 Not Implemented
SF0323 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $5,614 $1,181 Not Implemented
SF0323 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,718 $3,434 Implemented
SF0323 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,432 $8,974 Implemented
SF0323 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $5,355 Not Implemented
SF0323 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $117,125 $345,000 Not Implemented
SF0323 # 07 Y:2006 07 2006 INSTALL SKYLIGHTS $13,832 $47,430 Not Implemented
SD0371 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,113 $52 Not Implemented
SD0371 # 02 Y:2005 02 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $17,251 $3,850 Not Implemented
SD0371 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,329 $6,950 Not Implemented
SD0371 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,944 $12,000 Not Implemented
SD0371 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $140 Implemented
SD0371 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,914 $648 Not Implemented
SD0371 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,559 $55,084 Not Implemented
SD0371 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $31,048 $0 Not Implemented
SD0366 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $3,400 Not Implemented
SD0366 # 02 Y:2005 02 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,670 $75 Implemented
SD0366 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,553 $200 Not Implemented
SD0366 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,250 $160 Implemented
SD0366 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $900 Not Implemented
SD0366 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $695 $0 Implemented
SD0366 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,771 $17,633 Not Implemented
SD0366 # 08 Y:2005 08 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,248 $10,000 Not Implemented
SD0366 # 09 Y:2005 09 2005 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $19,018 $24,500 Implemented