Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0189 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,822 $0 Implemented
IP0189 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,723 $84,496 Implemented
IP0189 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,248 $716 Implemented
IP0187 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,797 $42,271 Not Implemented
IP0187 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $242 $74 Not Implemented
IP0187 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $0 Not Implemented
IP0187 # 04 Y:2023 04 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $238 $1,514 Not Implemented
IP0177 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,732 $210 Not Implemented
IP0177 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,187 $0 Not Implemented
IP0177 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,379 $0 Not Implemented
IP0177 # 06 Y:2023 06 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $91,806 $8,000 Not Implemented
IP0177 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,349 $3,260 Not Implemented
IP0177 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,815 $653 Not Implemented
IP0177 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,228 $764 Not Implemented
IP0177 # 11 Y:2023 11 2023 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $409,614 $304,570 Not Implemented
IP0177 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,714 $17,391 Not Implemented
IP0177 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $10,080 $0 Not Implemented
IP0177 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $431 $0 Not Implemented
IP0177 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,101 $1,200 Not Implemented
IP0173 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,365 $840 Not Implemented
IP0173 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,684 $61,320 Not Implemented
IP0173 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,055 $0 Not Implemented
IP0173 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $1,042 Not Implemented
IP0173 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $6,837 $33,000 Not Implemented
IP0173 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,485 $0 Not Implemented