Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,403
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0287 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,231 | $3,100 | n/a |
TT0287 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,905 | $1,050 | n/a |
TT0287 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,202 | $21,100 | n/a |
TT0287 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,887 | $113 | n/a |
TT0287 # 08 Y:2023 | 08 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,558 | $3,750 | n/a |
TT0287 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,170 | $7,500 | n/a |
TT0287 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,966 | $6,750 | n/a |
TT0287 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,643 | $100 | n/a |
TT0287 # 12 Y:2023 | 12 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $907 | $2,724 | n/a |
GT0963 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,639 | $1,850 | Implemented |
GT0963 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,457 | $400 | Not Implemented |
GT0963 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $725 | $450 | Implemented |
GT0963 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,308 | $1,330 | Not Implemented |
GT0963 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,066 | $11,282 | Not Implemented |
GT0963 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,072 | $862,249 | Not Implemented |
MS0409 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $44,271 | $0 | n/a |
MS0409 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $96 | $582 | n/a |
MS0409 # 03 Y:2022 | 03 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,770 | $0 | n/a |
UU0214 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,031 | $23,302 | Implemented |
UU0214 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,069 | $17,638 | Implemented |
UU0214 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,776 | $6,969 | Implemented |
UU0214 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,274 | $495 | Implemented |
UU0214 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $701 | $1,150 | Not Implemented |
UU0214 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $1,558 | Implemented |
UU0214 # 07 Y:2023 | 07 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,046 | $226,100 | Not Implemented |