IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0019 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,534 $106,743 Not Implemented
UA0019 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $4,299 Not Implemented
UA0019 # 06 Y:2008 06 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,660 $0 Implemented
UA0019 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $377 $520 Implemented
UA0019 # 08 Y:2008 08 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,641 $11,901 Not Implemented
UA0019 # 09 Y:2008 09 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,953 $0 Not Implemented
UA0019 # 10 Y:2008 10 2008 USE RADIANT HEATER FOR SPOT HEATING $46,005 $22,000 Not Implemented
UA0019 # 11 Y:2008 11 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,714 $9,100 Not Implemented
MS0109 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $3,776 Implemented
MS0109 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $402 $232 Implemented
MS0109 # 03 Y:1998 03 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,627 $6,800 Not Implemented
MS0109 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,919 $17,023 Not Implemented
MS0109 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $1,077 $1,898 Implemented
MS0109 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $14,495 $39,000 Not Implemented
MS0109 # 07 Y:1998 07 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,287 $0 Implemented
MS0109 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,944 $6,500 Not Implemented
MS0109 # 09 Y:1998 09 1998 BURN WASTE OIL FOR HEAT $8,290 $4,765 Not Implemented
MS0109 # 10 Y:1998 10 1998 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $283,220 $1,800,000 Not Implemented
GT0637 # 01 Y:1998 01 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,126 $3,000 Not Implemented
GT0637 # 02 Y:1998 02 1998 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $10,351 $1,450 Implemented
GT0637 # 03 Y:1998 03 1998 AIR CONDITION ONLY SPACE NECESSARY $1,154 $2,610 Implemented
GT0637 # 04 Y:1998 04 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $308,000 $20,000 Implemented
GT0637 # 05 Y:1998 05 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,033 $3,000 Implemented
GT0637 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $450 Implemented
GT0637 # 07 Y:1998 07 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $884 $7,620 Not Implemented