Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
584
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0422 # 04 Y:2023 | 04 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,309 | $280 | Implemented |
UF0592 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,580 | $600 | Implemented |
UF0592 # 01 Y:2023 | 01 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $73,113 | $215,600 | Not Implemented |
UF0592 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $56,023 | $88,370 | Implemented |
UF0592 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,274 | $30,607 | Implemented |
UF0592 # 04 Y:2023 | 04 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,287 | $18,600 | Implemented |
UF0592 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,922 | $11,796 | Implemented |
UF0592 # 07 Y:2023 | 07 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,981 | $508 | Implemented |
UF0592 # 08 Y:2023 | 08 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,672 | $1,200 | Implemented |
UF0592 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,412 | $25,400 | Not Implemented |
UF0592 # 10 Y:2023 | 10 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $62,417 | $10,000 | Implemented |
UF0592 # 11 Y:2023 | 11 | 2023 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $12,544 | $20,214 | Not Implemented |
MI0407 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,645 | $520 | Not Implemented |
MI0407 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,291 | $580 | Implemented |
MI0407 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $2,509 | $850 | Not Implemented |
MI0407 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,700 | $3,310 | Not Implemented |
MI0407 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $7,899 | Implemented |
MI0407 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $2,200 | Not Implemented |
MI0390 # 04 Y:2021 | 04 | 2021 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,586 | $1,120 | Not Implemented |
MI0390 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,477 | Implemented |
MI0390 # 02 Y:2021 | 02 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,349 | $7,564 | Not Implemented |
MI0390 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,273 | $1,040 | Implemented |
MI0377 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $688 | $682 | Not Implemented |
MI0377 # 10 Y:2020 | 10 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $744 | $965 | Not Implemented |
MI0377 # 09 Y:2020 | 09 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,158 | $1,827 | Not Implemented |