IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,403

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0027 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $216 Not Implemented
TS0027 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,348 $3,929 Not Implemented
TS0027 # 03 Y:1985 03 1985 INSTALL STORM WINDOWS AND DOORS $916 $1,275 Not Implemented
TS0027 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $555 $500 Not Implemented
TS0027 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,684 $0 Not Implemented
TS0027 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $104 $0 Not Implemented
AT0017 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $483 $381 Not Implemented
AT0017 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $146 $0 Implemented
AT0017 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $6,114 $0 Implemented
AT0017 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $2,313 $200 Not Implemented
AT0017 # 05 Y:1985 05 1985 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $10,225 $1,250 Not Implemented
CO0032 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $816 $500 Not Implemented
CO0032 # 02 Y:1985 02 1985 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $816 $2,000 Implemented
CO0032 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,062 $596 Not Implemented
CO0032 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,406 $0 Not Implemented
CO0032 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,972 $3,600 Implemented
CO0032 # 06 Y:1985 06 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $596 $1,500 Implemented
CO0032 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $1,500 Implemented
OK0176 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $428 $650 Implemented
OK0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $12 Implemented
OK0176 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $240 Implemented
OK0176 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $71 $145 Implemented
OK0176 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18 $60 Implemented
TS0022 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,270 $5,000 Not Implemented
TS0022 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $595 $0 Not Implemented