Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1986
Principal Product AUTOMOTIVE TRIM
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 364
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $399,688 6,043,083 kWh $0.07
Natural Gas $99,697 21,138 MMBtu $4.72
TOTAL ENERGY COSTS $499,385
RECOMMENDED SAVINGS* $51,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,917
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,692
Cost:
$708
$15,692 - - - - - $15,692
-
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,886
Cost:
$5,000
$5,886 89,977 - - - - $5,886
89,977
kWh
-
-
MMBtu
-
-
$
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$13,480
Cost:
$52,200
- - $13,480 2,856 - - -
-
kWh
$13,480
2,856
MMBtu
-
-
$
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$6,617
Cost:
$6,040
- - $6,617 1,402 - - -
-
kWh
$6,617
1,402
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,237
Cost:
$12,000
$2,544 42,790 $(-297) (-63) $1,990 - $2,544
42,790
kWh
$(-297)
(-63)
MMBtu
$1,990
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,622
Cost:
$11,000
- - $5,622 1,191 - - -
-
kWh
$5,622
1,191
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$51,534
Cost:
$86,948
$24,122 132,767 $25,422 5,386 $1,990 - $24,122
132,767
kWh
$25,422
5,386
MMBtu
$1,990
-
$
TOTAL IMPLEMENTED Savings:
$44,917
Cost:
$80,908
$24,122 132,767 $18,805 3,984 $1,990 - $24,122
132,767
kWh
$18,805
3,984
MMBtu
$1,990
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes