IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,397

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0185 # 02 Y:1983 02 1983 MINIMIZE WATER USAGE $8,324 $3,000 Not Implemented
GT0185 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,683 $4,700 Not Implemented
GT0185 # 04 Y:1983 04 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,993 $9,000 Not Implemented
GT0185 # 05 Y:1983 05 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,913 $97,700 Not Implemented
GT0185 # 06 Y:1983 06 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,729 $0 Not Implemented
GT0181 # 01 Y:1983 01 1983 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $20,000 $28,000 Not Implemented
GT0181 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,422 $9,000 Not Implemented
GT0181 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,800 $65,900 Not Implemented
GT0181 # 04 Y:1983 04 1983 OPTIMIZE PLANT POWER FACTOR $5,360 $12,000 Not Implemented
GT0181 # 05 Y:1983 05 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,800 $1,000 Not Implemented
KU0087 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,398 $30,000 Implemented
KU0087 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $15,570 $15,000 Implemented
KU0087 # 03 Y:1983 03 1983 MODERATE COOLING TOWER OUTLET TEMPERATURE $4,858 $0 Implemented
KU0087 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $39,664 $35,000 Implemented
KU0087 # 05 Y:1983 05 1983 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,056 $1,680 Implemented
KU0087 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,313 Not Implemented
OK0084 # 01 Y:1983 01 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,150 $913 Not Implemented
OK0084 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $115 $187 Implemented
OK0084 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $248 $203 Not Implemented
OK0084 # 04 Y:1983 04 1983 INSTALL TIMERS AND/OR THERMOSTATS $178 $377 Not Implemented
OK0084 # 05 Y:1983 05 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $800 $180 Not Implemented
OK0084 # 06 Y:1983 06 1983 USE OPTIMUM THICKNESS INSULATION $1,025 $832 Not Implemented
OK0084 # 07 Y:1983 07 1983 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,195 $300 Not Implemented
OK0084 # 08 Y:1983 08 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $332 $45 Not Implemented
OK0077 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $836 Not Implemented