IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0377 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,464 $1,700 Not Implemented
LE0377 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,125 $4,000 Not Implemented
LE0373 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,983 $0 Implemented
LE0373 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,793 $130,000 Implemented
LE0373 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $1,000 Implemented
LE0373 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,209 $1,225 Implemented
LE0373 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $2,400 Implemented
LE0373 # 06 Y:2014 06 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,750 $6,900 Not Implemented
LE0373 # 07 Y:2014 07 2014 REPLACE BOILER $93,869 $72,460 Not Implemented
LE0373 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,176 $4,410 Not Implemented
LE0373 # 09 Y:2014 09 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $681 $1,400 Not Implemented
LE0373 # 10 Y:2014 10 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,395 $4,250 Not Implemented
LE0372 # 01 Y:2014 01 2014 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $465 $30 Not Implemented
LE0372 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $857 $134 Not Implemented
LE0372 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $1,500 Implemented
LE0372 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,320 $520 Not Implemented
LE0372 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,601 $1,870 Not Implemented
LE0372 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,173 $5,400 Not Implemented
LE0372 # 07 Y:2014 07 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,519 $6,700 Not Implemented
LE0372 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $645 $711 Implemented
LE0372 # 09 Y:2014 09 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $24,930 $41,000 Not Implemented
LE0372 # 10 Y:2014 10 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,402 $13,500 Not Implemented
LE0372 # 11 Y:2014 11 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,045 $16,500 Implemented
LE0372 # 12 Y:2014 12 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $96 $210 Not Implemented
LE0372 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $7,792 Not Implemented