IAC Assessment: DL0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product Polymer Materials
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 222,000
Annual Production 200 Pieces
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,293,567 15,084,270 kWh $0.09
Electricity Demand $249,347 31,401 kW-months/year $7.94
Natural Gas $459,227 87,748 MMBtu $5.23
TOTAL ENERGY COSTS $2,092,712
RECOMMENDED SAVINGS* $687,843 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $286,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$112,390
Cost:
$100,000
- - - - $49,580 9,480 $62,810 - -
-
kWh
-
-
kW-months/year
$49,580
9,480
MMBtu
$62,810
-
Tgal
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$120,650
Cost:
$75,000
- - - - - - $120,650 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$120,650
-
Tgal
03: 2.7314 REDUCE VENTILATION AIR Savings:
$71,556
Cost:
$20,425
$9,256 107,630 $2,240 282 $60,060 11,484 - - $9,256
107,630
kWh
$2,240
282
kW-months/year
$60,060
11,484
MMBtu
-
-
Tgal
04: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$24,707
Cost:
$43,805
- - - - $24,707 4,724 - - -
-
kWh
-
-
kW-months/year
$24,707
4,724
MMBtu
-
-
Tgal
05: 2.7314 REDUCE VENTILATION AIR Savings:
$17,474
Cost:
$12,465
$2,840 33,022 $564 71 $14,070 2,690 - - $2,840
33,022
kWh
$564
71
kW-months/year
$14,070
2,690
MMBtu
-
-
Tgal
06: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$4,116
Cost:
$33,900
- - - - $4,116 787 - - -
-
kWh
-
-
kW-months/year
$4,116
787
MMBtu
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,229
Cost:
$126,010
$38,416 446,700 $8,813 1,110 - - - - $38,416
446,700
kWh
$8,813
1,110
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,011
Cost:
$29,090
$23,280 270,700 $1,731 218 - - - - $23,280
270,700
kWh
$1,731
218
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,505
Cost:
$14,190
$11,640 135,350 $865 109 - - - - $11,640
135,350
kWh
$865
109
kW-months/year
-
-
MMBtu
-
-
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,820
Cost:
$5,950
$11,720 136,300 $3,100 390 - - - - $11,720
136,300
kWh
$3,100
390
kW-months/year
-
-
MMBtu
-
-
Tgal
11: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$12,280
Cost:
$44,260
$12,280 142,790 - - - - - - $12,280
142,790
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,910
Cost:
$50,580
$35,460 412,350 $4,450 560 - - - - $35,460
412,350
kWh
$4,450
560
kW-months/year
-
-
MMBtu
-
-
Tgal
13: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$111,210
Cost:
$37,500
$142,420 1,656,000 $3,570 450 $(-34,780) (-6,650) - - $142,420
1,656,000
kWh
$3,570
450
kW-months/year
$(-34,780)
(-6,650)
MMBtu
-
-
Tgal
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,320
Cost:
$48,975
$13,570 157,790 $1,750 220 - - - - $13,570
157,790
kWh
$1,750
220
kW-months/year
-
-
MMBtu
-
-
Tgal
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,210
Cost:
$19,270
$8,180 95,090 $1,030 130 - - - - $8,180
95,090
kWh
$1,030
130
kW-months/year
-
-
MMBtu
-
-
Tgal
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,545
Cost:
$13,865
$1,370 15,905 $175 22 - - - - $1,370
15,905
kWh
$175
22
kW-months/year
-
-
MMBtu
-
-
Tgal
17: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$31,880
Cost:
$35,865
$10,080 117,180 $1,270 160 $20,530 3,925 - - $10,080
117,180
kWh
$1,270
160
kW-months/year
$20,530
3,925
MMBtu
-
-
Tgal
18: 2.7314 REDUCE VENTILATION AIR Savings:
$8,800
Cost:
$7,920
$1,590 18,510 $200 25 $7,010 1,340 - - $1,590
18,510
kWh
$200
25
kW-months/year
$7,010
1,340
MMBtu
-
-
Tgal
19: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,230
Cost:
$9,840
$5,880 68,375 $1,350 170 - - - - $5,880
68,375
kWh
$1,350
170
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$687,843
Cost:
$728,910
$327,982 3,813,692 $31,108 3,917 $145,293 27,780 $183,460 - $327,982
3,813,692
kWh
$31,108
3,917
kW-months/year
$145,293
27,780
MMBtu
$183,460
-
Tgal
TOTAL IMPLEMENTED Savings:
$286,921
Cost:
$238,095
$48,010 558,255 $5,871 739 $49,580 9,480 $183,460 - $48,010
558,255
kWh
$5,871
739
kW-months/year
$49,580
9,480
MMBtu
$183,460
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption