IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

423

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0277 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,801 $3,568 Not Implemented
SU0277 # 06 Y:2009 06 2009 REDUCE VENTILATION AIR $6,910 $13,891 Not Implemented
SU0277 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $91 $288 Not Implemented
SU0277 # 08 Y:2009 08 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,228 $160,000 Implemented
SU0260 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,228 $0 Implemented
SU0260 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,676 $0 Not Implemented
SU0260 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,312 $0 Not Implemented
SU0260 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $685 $0 Implemented
SU0260 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,644 $1,034 Implemented
SU0260 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,677 $490 Implemented
SU0260 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $142 $739 Not Implemented
SU0260 # 08 Y:2007 08 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $151,680 $914,460 Not Implemented
SU0249 # 01 Y:2007 01 2007 USE SYNTHETIC LUBRICANT $2,139 $0 Not Implemented
SU0249 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,594 $0 Implemented
SU0249 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
SU0249 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $289 Implemented
SU0249 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $589 Implemented
SU0249 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $334 Implemented
SU0249 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,719 $16,400 Implemented
SU0249 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,403 $19,107 Implemented
SU0249 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $103 $457 Not Implemented
SU0236 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,860 $0 Not Implemented
SU0236 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,416 $171 Not Implemented
SU0236 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $868 $127 Implemented
SU0236 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,245 $713 Implemented