Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
347
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0270 # 02 Y:1993 | 02 | 1993 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $14,790 | $16,720 | Not Implemented |
CO0270 # 03 Y:1993 | 03 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,020 | $2,500 | Implemented |
CO0270 # 04 Y:1993 | 04 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,450 | $2,850 | Implemented |
CO0271 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $34,060 | $400 | Implemented |
CO0271 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,640 | $400 | Implemented |
CO0271 # 03 Y:1993 | 03 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,260 | $2,500 | Implemented |
CO0271 # 04 Y:1993 | 04 | 1993 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,240 | $8,000 | Not Implemented |
CO0271 # 05 Y:1993 | 05 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,634 | $37,430 | Implemented |
CO0248 # 01 Y:1992 | 01 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,210 | $350 | Not Implemented |
CO0248 # 02 Y:1992 | 02 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $4,000 | Not Implemented |
CO0248 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,170 | $730 | Not Implemented |
CO0248 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,750 | $37,860 | Not Implemented |
CO0248 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $4,760 | Not Implemented |
CO0248 # 06 Y:1992 | 06 | 1992 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,460 | $17,470 | Not Implemented |
CO0248 # 07 Y:1992 | 07 | 1992 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $280 | $170 | Not Implemented |
CO0248 # 08 Y:1992 | 08 | 1992 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $400 | $40 | Not Implemented |
CO0247 # 01 Y:1992 | 01 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,020 | $1,250 | Implemented |
CO0247 # 02 Y:1992 | 02 | 1992 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,990 | $1,800 | Implemented |
CO0247 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,480 | $2,560 | Implemented |
CO0247 # 04 Y:1992 | 04 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,610 | $40 | Implemented |
CO0247 # 05 Y:1992 | 05 | 1992 | INSTALL AUTOMATIC STACK DAMPER | $6,430 | $6,000 | Implemented |
CO0247 # 06 Y:1992 | 06 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,850 | $7,600 | Implemented |
CO0247 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $490 | $780 | Implemented |
CO0247 # 08 Y:1992 | 08 | 1992 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $590 | $1,350 | Implemented |
CO0247 # 09 Y:1992 | 09 | 1992 | UPGRADE CONTROLS ON COMPRESSORS | $5,970 | $12,000 | Implemented |