Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
586
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0326 # 06 Y:2025 | 06 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $657 | $3,632 | n/a |
IC0326 # 08 Y:2025 | 08 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,398 | $114,881 | n/a |
IC0326 # 01 Y:2025 | 01 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,345 | $13,327 | n/a |
IC0326 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $0 | n/a |
IC0326 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,819 | $678 | n/a |
IC0326 # 09 Y:2025 | 09 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $941 | $0 | n/a |
IC0326 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $2,266 | $2,982 | n/a |
IC0326 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,821 | $4,859 | n/a |
IC0326 # 10 Y:2025 | 10 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93 | $0 | n/a |
IC0326 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $393 | $1,089 | n/a |
IC0282 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,144 | $7,160 | Implemented |
IC0282 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,241 | $4,067 | Not Implemented |
IC0282 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,637 | $3,994 | Implemented |
IC0282 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $132,518 | $1,169,610 | Not Implemented |
IC0281 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,536 | $7,857 | Implemented |
IC0281 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $109,160 | $660,787 | Not Implemented |
IC0281 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,262 | $5,407 | Not Implemented |
IC0281 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,197 | $3,250 | Implemented |
IC0281 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $1,249 | $804 | Implemented |
IC0281 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,327 | $2,879 | Not Implemented |
IC0253 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,199 | $9,023 | Not Implemented |
IC0253 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $39,245 | $13,624 | Not Implemented |
IC0253 # 05 Y:2022 | 05 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $21,572 | $7,624 | Not Implemented |
IC0253 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50 | $0 | Not Implemented |
IC0253 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $43,447 | $8,510 | Not Implemented |