Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0298 # 10 Y:1989 | 10 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $361 | $0 | Implemented |
KU0298 # 09 Y:1989 | 09 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $531 | $1,020 | Not Implemented |
KU0298 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,437 | $382 | Implemented |
KU0298 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $380 | $76 | Implemented |
KU0298 # 03 Y:1989 | 03 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,572 | $100 | Implemented |
KU0298 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $261 | $300 | Implemented |
KU0298 # 05 Y:1989 | 05 | 1989 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,951 | $3,700 | Not Implemented |
KU0298 # 06 Y:1989 | 06 | 1989 | ISOLATE HOT OR COLD EQUIPMENT | $1,026 | $1,800 | Not Implemented |
KU0298 # 07 Y:1989 | 07 | 1989 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $856 | $700 | Not Implemented |
KU0298 # 11 Y:1989 | 11 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $120 | $0 | Implemented |
KU0298 # 08 Y:1989 | 08 | 1989 | INSULATE BARE EQUIPMENT | $727 | $310 | Implemented |
MA0167 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,828 | $500 | Not Implemented |
MA0167 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $300 | Not Implemented |
MA0167 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $192 | $0 | Not Implemented |
MA0167 # 06 Y:1989 | 06 | 1989 | INSULATE BARE EQUIPMENT | $2,131 | $0 | Not Implemented |
MA0167 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,507 | $197 | Implemented |
MA0167 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,897 | $5,985 | Not Implemented |
MA0163 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $285 | Implemented |
MA0163 # 02 Y:1989 | 02 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,427 | $0 | Implemented |
MA0163 # 05 Y:1989 | 05 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,890 | $4,255 | Not Implemented |
GT0386 # 08 Y:1989 | 08 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,015 | $39,300 | Implemented |
GT0386 # 06 Y:1989 | 06 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $20 | Implemented |
GT0386 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $83 | $0 | Implemented |
GT0386 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95 | $58 | Implemented |
MA0163 # 06 Y:1989 | 06 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,603 | $13,662 | Not Implemented |