IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

492

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0572 # 01 Y:1995 01 1995 REDESIGN PROCESS $7,850 $1,000 Implemented
GT0572 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,560 $1,190 Implemented
GT0572 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,550 $6,400 Not Implemented
GT0572 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,530 $9,020 Implemented
GT0572 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,350 $1,000 Not Implemented
GT0571 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $300 Not Implemented
GT0571 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $10,000 Not Implemented
GT0571 # 06 Y:1995 06 1995 ADD AREA LIGHTING SWITCHES $70 $150 Not Implemented
GT0571 # 04 Y:1995 04 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,620 $2,500 Not Implemented
GT0571 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $890 $2,700 Not Implemented
GT0571 # 01 Y:1995 01 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $110 $300 Not Implemented
HO0121 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,913 $2,160 Implemented
HO0121 # 05 Y:1995 05 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $720 $5,000 Not Implemented
HO0121 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $2,318 Implemented
HO0121 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,049 $160 Implemented
HO0121 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $739 $598 Implemented
AS0165 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,574 $7,707 n/a
AS0165 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $391 $0 n/a
AS0165 # 08 Y:1995 08 1995 INSTALL OCCUPANCY SENSORS $528 $675 n/a
AS0165 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,309 $3,918 n/a
AS0165 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,842 $3,169 n/a
AS0165 # 04 Y:1995 04 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,748 $426 n/a
AS0165 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,443 $8,000 n/a
AS0165 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,409 $4,988 n/a
UF0134 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,418 $10,501 Not Implemented