Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
395
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0497 # 08 Y:2001 | 08 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,760 | $250 | Implemented |
CO0497 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,470 | $7,170 | Implemented |
CO0497 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,250 | $12,000 | n/a |
CO0497 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $770 | $430 | Implemented |
CO0497 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $0 | Implemented |
CO0497 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,610 | $22,110 | Implemented |
CO0497 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $440 | Implemented |
CO0497 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $87,600 | $6,280 | Implemented |
OK0627 # 03 Y:2001 | 03 | 2001 | INSTALL SET-BACK TIMERS | $4,270 | $1,050 | Not Implemented |
OK0627 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $1,194 | $1,680 | Not Implemented |
OK0627 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,445 | $200 | Not Implemented |
OK0627 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,466 | $9,056 | Implemented |
OK0627 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,203 | $7,500 | Not Implemented |
UU0003 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,150 | $18,860 | Not Implemented |
UU0003 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,867 | $140 | Implemented |
UU0003 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,239 | $13,990 | Not Implemented |
UU0003 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,062 | $4,761 | Implemented |
IA0279 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $40 | Implemented |
IA0279 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,330 | $0 | Not Implemented |
IA0279 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,176 | $614 | Implemented |
IA0279 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,710 | $18,774 | Not Implemented |
IA0279 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,986 | $3,040 | Implemented |
IA0279 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,846 | $0 | Not Implemented |
IA0279 # 08 Y:2001 | 08 | 2001 | USE POWER DURING OFF-PEAK PERIODS | $16,097 | $0 | Implemented |
IA0279 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,459 | $422 | Implemented |