Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
376
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0501 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,008 | $0 | Not Implemented |
WI0501 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,905 | $0 | Not Implemented |
WI0501 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $921 | $800 | Not Implemented |
WI0501 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,224 | $19,800 | Not Implemented |
WI0501 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,037 | $30,800 | Not Implemented |
WI0501 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,873 | $0 | Not Implemented |
WI0500 # 05 Y:2005 | 05 | 2005 | IMPROVE LUBRICATION PRACTICES | $4,137 | $4,810 | n/a |
WI0500 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,617 | $52,200 | n/a |
WI0500 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,522 | $640 | n/a |
WI0500 # 04 Y:2005 | 04 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,380 | $0 | n/a |
WI0500 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,252 | $2,032 | n/a |
WI0500 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $208 | n/a |
WI0500 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $57,577 | $25,000 | n/a |
LE0222 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $480 | Not Implemented |
TA0104 # 01 Y:2005 | 01 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,070 | $0 | Implemented |
LE0222 # 09 Y:2005 | 09 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,823 | $500 | Not Implemented |
LE0222 # 01 Y:2005 | 01 | 2005 | ADD ADDITIONAL PRODUCTION SHIFT | $96,000 | $5,000 | Not Implemented |
TA0104 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,020 | $1,880 | Not Implemented |
LE0222 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,410 | $49,000 | Not Implemented |
LE0222 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,048 | $2,000 | Not Implemented |
LE0222 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,752 | $200 | Not Implemented |
LE0222 # 03 Y:2005 | 03 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $5,760 | $5,100 | Not Implemented |
LE0222 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,714 | $7,800 | Not Implemented |
TA0104 # 02 Y:2005 | 02 | 2005 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $22,990 | $0 | Implemented |
TA0104 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $6,461 | $244 | Implemented |