IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
TR0040 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,309 $128,100 Not Implemented
MS0409 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $96 $582 n/a
MS0409 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,770 $0 n/a
MS0409 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,271 $0 n/a
WV0636 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $299 $465 Implemented
WV0636 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,625 $18,739 Implemented
WV0636 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $670 $78 Implemented
WV0636 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,927 $2,021 Implemented
WV0636 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,943 $7,374 Not Implemented
WV0636 # 08 Y:2022 08 2022 DEVELOP A REPAIR/REPLACE POLICY $217 $598 Implemented
WV0636 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,546 $5,490 Not Implemented
WV0636 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,868 $465 Implemented
WV0636 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,183 $4,755 Not Implemented
TR0029 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,939 $24,345 Implemented
TR0029 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $5,000 Implemented
TR0029 # 03 Y:2022 03 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,707 $2,500 Not Implemented
MU0020 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,861 $320 Not Implemented
MU0020 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $19 $87 Not Implemented
MU0020 # 09 Y:2022 09 2022 REDUCE HEAT GAIN BY WINDOW TINTING $1,907 $16,186 Not Implemented
MU0020 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $671 $0 Not Implemented
MU0020 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $188 $0 Not Implemented
MU0020 # 10 Y:2022 10 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $210,000 $0 Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented