Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
336
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0203 # 01 Y:2024 | 01 | 2024 | USE AUTOMATIC FLOW CONTROL | $56,666 | $700 | n/a |
IP0203 # 05 Y:2024 | 05 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $64,223 | $20,000 | n/a |
IP0203 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,015 | $1,072 | n/a |
IP0203 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,835 | $1,480 | n/a |
IP0203 # 02 Y:2024 | 02 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $55,966 | $1,300 | n/a |
IP0203 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,564 | $44 | n/a |
UA0292 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $442,079 | $4,045,808 | n/a |
UA0292 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $4,038 | $8,787 | n/a |
UA0292 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,538 | $8,918 | n/a |
UA0292 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,553 | $600 | n/a |
UA0292 # 03 Y:2024 | 03 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $3,064 | $893 | n/a |
UL2415 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $28,874 | $11,700 | n/a |
UL2415 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,820 | $0 | n/a |
UL2415 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,401 | $2,438 | n/a |
UL2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,257 | $2,700 | n/a |
UL2415 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,863 | $758,879 | n/a |
UL2415 # 03 Y:2024 | 03 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $62,771 | $58,367 | n/a |
AS0591 # 07 Y:2024 | 07 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $530 | $1,940 | n/a |
AS0591 # 08 Y:2024 | 08 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $487 | $1,215 | n/a |
AS0591 # 09 Y:2024 | 09 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $407 | $324 | n/a |
AS0591 # 10 Y:2024 | 10 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $278 | $454 | n/a |
AS0591 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $7,359 | n/a |
AS0591 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,380 | $545,958 | n/a |
AS0591 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $795,203 | $2,763,501 | n/a |
AS0591 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $932,699 | $336,920 | n/a |