IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0440 # 02 Y:1991 02 1991 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,819 $0 Not Implemented
RU0128 # 04 Y:1991 04 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,320 $0 Implemented
RU0128 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $630 $169 Implemented
RU0128 # 06 Y:1991 06 1991 USE OPTIMUM TEMPERATURE $4,975 $6,700 Implemented
TN0440 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $23,728 $710 Not Implemented
ND0009 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $0 Implemented
RU0121 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,136 $0 Implemented
RU0121 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $267 Implemented
RU0121 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,917 $459 Implemented
RU0121 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $500 Implemented
RU0121 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,648 $0 Implemented
RU0121 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $51,300 $0 Implemented
RU0121 # 07 Y:1991 07 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,329 $900 Implemented
CO0222 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $1,034 Not Implemented
CO0222 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $0 Not Implemented
CO0222 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $8,970 $10,720 Not Implemented
CO0222 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $1,810 Not Implemented
CO0222 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $214 $150 Not Implemented
CO0222 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,271 $1,972 Not Implemented
CO0222 # 07 Y:1991 07 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,350 $4,000 Not Implemented
MA0219 # 05 Y:1991 05 1991 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $8,835 $3,850 Implemented
MA0219 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,849 $0 Implemented
MA0219 # 02 Y:1991 02 1991 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $30,005 $7,000 Implemented
MA0219 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,604 $446 Implemented
MA0219 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $629 $85 Implemented