IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0115 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,087 $6,840 Implemented
RU0115 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,343 $0 Implemented
RU0115 # 07 Y:1991 07 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,041 $2,700 Implemented
RU0115 # 08 Y:1991 08 1991 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,372 $875 Implemented
RU0112 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,746 $368 Not Implemented
RU0112 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,909 $0 Not Implemented
RU0112 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $10,102 $800 Not Implemented
RU0112 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,299 $839 Not Implemented
RU0112 # 05 Y:1991 05 1991 REPAIR AND ELIMINATE STEAM LEAKS $1,725 $430 Not Implemented
RU0112 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,807 $31,015 Not Implemented
UD0338 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,351 $0 Not Implemented
UD0338 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,344 $0 Not Implemented
UD0338 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,748 $0 Not Implemented
UD0334 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,567 $0 Implemented
UD0334 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,627 $4,000 Implemented
UD0334 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,208 $0 Implemented
MA0204 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,629 $0 Not Implemented
MA0204 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $12,296 $3,400 Not Implemented
MA0204 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,632 $46,085 Not Implemented
MA0204 # 04 Y:1991 04 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,064 $11,160 Not Implemented
MA0204 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,027 $31,600 Not Implemented
MA0204 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $48 Not Implemented
AM0108 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,366 $0 Implemented
AM0108 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,700 $12,000 Implemented
AM0108 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,750 $0 Implemented