IAC logo
IAC Assessment: AM0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1991
Principal Product COOLING TOWER PARTS
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 2,770,000 Pounds
Production Hrs. Annual 6,120
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,562 1,612,544 kWh $0.07
Natural Gas $2,789 590 MMBtu $4.73
TOTAL ENERGY COSTS $108,351
RECOMMENDED SAVINGS* $14,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,627
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,366
Cost:
-
$3,660 60,375 - - $(-294) - $3,660
60,375
kWh
-
-
MMBtu
$(-294)
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,700
Cost:
$12,000
$5,700 111,372 - - - - $5,700
111,372
kWh
-
-
MMBtu
-
-
$
03: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$3,750
Cost:
-
$3,750 55,979 - - - - $3,750
55,979
kWh
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,400
Cost:
$103
$1,400 28,136 - - - - $1,400
28,136
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$80
Cost:
$60
$80 1,172 - - - - $80
1,172
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$235
Cost:
$181
- - $235 53 - - -
-
kWh
$235
53
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$96
Cost:
$426
$96 1,758 - - - - $96
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,627
Cost:
$12,770
$14,686 258,792 $235 53 $(-294) - $14,686
258,792
kWh
$235
53
MMBtu
$(-294)
-
$
TOTAL IMPLEMENTED Savings:
$14,627
Cost:
$12,770
$14,686 258,792 $235 53 $(-294) - $14,686
258,792
kWh
$235
53
MMBtu
$(-294)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes