Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
247
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0310 # 02 Y:2006 | 02 | 2006 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $30,322 | $27,325 | Not Implemented |
UM0310 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,000 | $14,850 | Implemented |
UM0310 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,978 | $375 | Implemented |
UM0310 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,694 | $2,000 | Not Implemented |
UM0310 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,854 | $225 | Implemented |
CO0588 # 01 Y:2006 | 01 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,610 | $9,470 | Implemented |
CO0588 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,500 | $50 | Implemented |
CO0588 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,244 | $493 | Implemented |
CO0588 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $200 | $510 | Implemented |
CO0588 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,290 | $57,670 | Implemented |
CO0588 # 06 Y:2006 | 06 | 2006 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,680 | $1,310 | Implemented |
CO0588 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $2,970 | Implemented |
CO0588 # 08 Y:2006 | 08 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,300 | $2,950 | Not Implemented |
CO0588 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $130 | $390 | Not Implemented |
MI0133 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,100 | $10,050 | Not Implemented |
MI0133 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $86,700 | $3,400 | Not Implemented |
MI0133 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,350 | $3,400 | Not Implemented |
MI0133 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,584 | $964 | Implemented |
MI0133 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,755 | $30 | Implemented |
MI0133 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $34,704 | $0 | Implemented |
MI0132 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8 | $23,253 | Not Implemented |
MI0132 # 03 Y:2006 | 03 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $222 | $1,732 | Implemented |
MI0132 # 05 Y:2006 | 05 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $697 | $20,253 | Not Implemented |
MI0132 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $49 | $2,342 | Implemented |
MI0132 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $889 | $0 | Implemented |