IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

340

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0448 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $4,442 $1,512 Implemented
SU0448 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,066 $3,806 Implemented
SU0448 # 07 Y:2017 07 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,044 $1,820 Implemented
SU0448 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $975 Implemented
SU0448 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $260 Implemented
SU0448 # 10 Y:2017 10 2017 REDUCE VENTILATION AIR $680 $913 Implemented
SU0448 # 11 Y:2017 11 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,224 $37,300 Implemented
AS0445 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,548 $4,394 Not Implemented
AS0445 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $12,650 Not Implemented
AS0445 # 03 Y:2017 03 2017 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $813 $675 Not Implemented
UD0971 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,580 $0 Implemented
UD0971 # 02 Y:2017 02 2017 USE MINIMUM STEAM OPERATING PRESSURE $10,210 $50 Not Implemented
UD0971 # 03 Y:2017 03 2017 COVER OPEN TANKS $8,336 $2,760 Not Implemented
UD0971 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $972 $50 Implemented
UD0971 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $2,213 $500 Not Implemented
UD0971 # 06 Y:2017 06 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $681 Not Implemented
UD0971 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,936 $3,000 Not Implemented
UD0971 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,180 $3,650 Not Implemented
UD0971 # 09 Y:2017 09 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,055 $178,850 Not Implemented
UD0971 # 10 Y:2017 10 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,985 $22,000 Not Implemented
AS0442 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $25,870 $7,794 Not Implemented
AS0442 # 02 Y:2017 02 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,847 $5,691 Not Implemented
AS0442 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,680 $720 Not Implemented
MI0317 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,418 $1,660 Implemented
MI0317 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $33,420 $46,515 Implemented