Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
932
matching recommendationsSIC | 3081 | Unsupported Plastics Film & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0139 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,375 | $19,745 | Not Implemented |
DL0139 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,510 | $2,330 | Not Implemented |
DL0139 # 03 Y:2015 | 03 | 2015 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,240 | $9,280 | Not Implemented |
DL0139 # 04 Y:2015 | 04 | 2015 | REDUCE VENTILATION AIR | $850 | $0 | Not Implemented |
DL0139 # 05 Y:2015 | 05 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $6,100 | $710 | Not Implemented |
DL0139 # 06 Y:2015 | 06 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,120 | $0 | Not Implemented |
DL0139 # 07 Y:2015 | 07 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $320 | $710 | Not Implemented |
DL0139 # 08 Y:2015 | 08 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $320 | $90 | Not Implemented |
DL0139 # 09 Y:2015 | 09 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $810 | $700 | Not Implemented |
DL0139 # 10 Y:2015 | 10 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,040 | $22,500 | Not Implemented |
WV0482 # 16 Y:2014 | 16 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $507 | $1,167 | Implemented |
WV0482 # 01 Y:2014 | 01 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $177,357 | $198,000 | Not Implemented |
WV0482 # 02 Y:2014 | 02 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $135,791 | $7,100 | Implemented |
WV0482 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $37,833 | $0 | Not Implemented |
WV0482 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,141 | $51,865 | Implemented |
WV0482 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $35,144 | $1,000 | Implemented |
WV0482 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,791 | $38,441 | Implemented |
WV0482 # 07 Y:2014 | 07 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $17,822 | $26,000 | Implemented |
WV0482 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,536 | $9,000 | Implemented |
WV0482 # 09 Y:2014 | 09 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,132 | $27,380 | Not Implemented |
WV0482 # 10 Y:2014 | 10 | 2014 | REDUCE EXCESSIVE BOILER BLOWDOWN | $7,886 | $8,000 | Not Implemented |
WV0482 # 11 Y:2014 | 11 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,903 | $1,632 | Implemented |
WV0482 # 12 Y:2014 | 12 | 2014 | INSTALL OCCUPANCY SENSORS | $6,231 | $1,020 | Not Implemented |
WV0482 # 13 Y:2014 | 13 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,804 | $200 | Implemented |
WV0482 # 14 Y:2014 | 14 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $3,427 | $708 | Implemented |